-
E-mail
1784200847@qq.com
-
Phone
13730593665
-
Address
Cangzhou Hecheng Street Town Industrial Zone
Hebei Ruijian Experimental Instrument Equipment Factory
1784200847@qq.com
13730593665
Cangzhou Hecheng Street Town Industrial Zone
Concrete (curing box/standard curing box/constant temperature and humidity curing box)summary:(The white plastic box on the sensor inside the box should be filled with water and must not be cut off)
Concrete (curing box/standard curing box/constant temperature and humidity curing box) based onGB1345-99The "Method for Testing the Stability of Cement Standard Consistency, Water Consumption, and Setting Time" is developed, designed, and manufactured based on technical data provided by the Building Materials Research Institute and relevant departments. It is suitable for large, medium, and small cement plants, as well as construction and engineering departments, for the setting and curing of concrete and cement specimens.
On the basis of the original maintenance box, a series of improvements have been made. The box door is sealed with magnetic adhesive strips, and the insulation layer is made of insulation cotton with good insulation effect. A refrigeration unit is added inside, which runs smoothly and has low noise. The heater is made of copper tube, which is rust proof and corrosion-resistant. The humidification device has a beautiful appearance, and the controller controls the temperature and humidity with high accuracy. A user troubleshooting and maintenance table has been added in the user manual as a basis for users to provide records to the factory during maintenance, so that our maintenance box can be improved in the production process, and the product can be durable and meet the user's requirements.
Main technical parameters:
1Control humidity temperature:RH90%Above
2Control temperature:20℃±1℃
3Power supply voltage:220V 50HZ
4Heating power:1000W
5Cooling power:145W
6Humidification power:45W
7IncreasewetQuantity:400milliliter/hour
8Humidifier volume:5.5L
9Box space:
40BType can be placed150Concrete test block15group/18group/20group
60BType can be placed150Concrete test block30group/40group/60group