-
E-mail
changliu006@126.com
-
Phone
18915420690
-
Address
Room 402, Building 117, Shuangyin International, No. 1388 Dongfang Avenue, Wuzhong District, Suzhou
Suzhou Yikang Environmental Testing Co., Ltd
changliu006@126.com
18915420690
Room 402, Building 117, Shuangyin International, No. 1388 Dongfang Avenue, Wuzhong District, Suzhou
●Temperature probe comparison
●Temperature uniformity test
●Open door test
●Power off test
Introduction to Testing Methods
1Comparison of temperature probes
Tie the calibrated probe together with the temperature probe inside the device for comparison, and the error between the temperature displayed by the device and the temperature detected by the temperature verification instrument is within the allowable range.
2Temperature uniformity testVerify whether the temperature at each point of the stability test chamber can be maintained within the required temperature range within the specified time.
a.Number the verified temperature probes and evenly distribute them inside the test chamber.
b.Perform verification operations according to the operating procedures of the verification system, set sampling intervals, calculate the difference between the average temperature of cold and hot spots and the average temperature inside the chamber within a certain period of time, and record it.
3Open door test
Open the door of the test chamber and connect it to the outside world5minAfter closing, verify how long the temperature inside the test chamber can be maintained within the required temperature range again.
a.The door of the stability test chamber is open5minClose afterwards;
b.Probe distribution: Same temperature distribution.
c.Open the program and run it automatically. During operation, verify that the system records temperature data at each point to check its stability.
4Power off test
After the test box is powered off, verify how long the temperature inside the test box can be maintained within the required temperature range.
a.Disconnect the power supply of the incubator
b.Probe distribution:Same temperature distribution
c.Testing process: Start the program, wait for the device to run stably, disconnect the power supply of the test box, and verify that the system records temperature data at each point.
Changyan Testing Certification (Suzhou) Co., LtdIt is an independent inspection agency in the industry, with independent legal personality and third-party laboratory status. Provide professional services for domestic purification plants and equipmentCleanroom testingOzone concentration detection, equipment testing, and testing consulting services.