Welcome Customer !

Membership

Help

Shanghai Tujun Environmental Protection Equipment Co., Ltd
Custom manufacturer

Main Products:

mechb2b>Products

Integrated sewage discharge machine

NegotiableUpdate on 01/22
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The sewage forced discharge integrated machine pumps sewage into the equipment according to the rated flow rate, starts the fan for aeration, and observes the filling situation in the contact tank every day. If an orange yellow or black film grows on the filling, this process usually takes 7-15 days.

Product Details

Integrated sewage discharge machinePump the sewage into the equipment according to the rated flow rate, start the fan for aeration, and observe the filling situation in the contact tank every day. If an orange yellow or black film grows on the filling, this process usually takes 7-15 days.

We promise to provide lifelong maintenance and repair services for this project.
2. No pre-treatment required: The working environment temperature can work normally between -30 ℃ and 95 ℃, humidity between 30% and 98%, and pH value between 3-13;
3. Higher sewage treatment standards. Through the use of integrated sewage treatment methods and practical testing, this sewage treatment process can achieve the recycling of sewage, greatly reducing the discharge of sewage during treatment. Moreover, the possibility of the discharged sewage meeting the prescribed standards is greater. This is where there are more technological advantages compared to traditional sewage treatment methods.
3. The rapid decomposition of ozone into oxygen is the * advantage of ozone as a disinfectant.
4. The material of the treatment tank can be stainless steel, carbon steel anti-corrosion, steel plastic composite materials, fiberglass or plastic, etc., and meet the requirements of service life. When using carbon steel anti-corrosion material, the carbon steel used should be Q23 type.
5. Add 2kg of chlorine tablets into the material cylinder of the slow-release sterilizer and tighten the lid; Check the opening and closing status of the equipment valves. All ball valves should be opened, and then the equipment control box should be set to automatic mode to operate the equipment; The equipment needs to regularly clean the Y-shaped filter;
6. Regularly check the water level indicator pipe of the dissolved gas tank to control it within a certain range (usually within 60-100 centimeters). To ensure the effectiveness of gas dissolution. To avoid a large amount of air entering the air flotation tank and damaging the water purification effect and floating slag layer due to the emptying of the dissolved gas tank water level. For those equipped with automatic liquid level control devices for dissolved gas tanks, attention should be paid to the maintenance and upkeep of the equipment.
7. Water pumps, air compressors, and foam blowers should be regularly lubricated with lubricants. Generally, air compressors should be lubricated every two months and replaced every six months.
8. Treatment process and principle: Grid well - regulating tank - sewage treatment equipment (including primary sedimentation tank - contact oxidation tank - secondary sedimentation tank) - disinfection tank - discharge.

1. Equipped with soil deodorization facilities. It utilizes reinforced concrete structure to set up improved soil and air distribution pipes in the upper space of the pool body. When odorous components dissolve in the soil moisture through the soil layer, they are then transferred into the soil due to surface adsorption and chemical reactions, and decomposed by microorganisms to achieve deodorization.
2. The equipment control center completes the work program on the microcomputer cabinet in one go according to the design arrangement. (Manual control is not allowed unless there are special circumstances), manual control is achieved through the button switch on the panel, and the submersible sewage pump, fan, etc. are manually controlled to turn on and off.
3. Arrange the frames neatly on the rack as required, and place the processed filter cloth neatly on the filter plates, paying attention to the correspondence between the feeding holes and rinsing holes between the filter plates.
4. Debugging: For industrial organic wastewater, it is best to first cultivate a biofilm with domestic sewage, and then gradually introduce industrial sewage for biofilm training.
5. Under the condition of ensuring a total sludge return ratio of 60% to 100%, the return sludge ratio to the anaerobic section is generally 10%, which can meet the demand for phosphorus, while the remaining return sludge is returned to the anoxic section to ensure the demand for nitrogen.
6. Adequate space should be left around the filter press for easy operation and maintenance.
7. And avoid frequent contact between sewage treatment equipment and sludge to prevent rusting and other problems caused by environmental supermarkets. Carry out daily anti-corrosion work and maintain sewage treatment equipment, such as regular oiling and sludge cleaning.
When the regulating pool reaches the middle water level, the system is in normal operation and one water pump is turned on;
9. The cleaning cycle used for flue cleaning is relatively short, which means that the cleaning method for mechanical equipment is less oily. First, clean the spray pipe to soften the oil, and then use a 30 meter long electric flexible shaft to clean the oil. This method is used in a vertical flue that is 28 centimeters long and wide, and cannot be manually entered into the hidden small flue. Not easy to clean, easy to shorten the cleaning cycle. Accelerate the accumulation of oil droplets, facilitate separation, and heat the air. Fuel flow rate and flushing process.
Integrated sewage discharge machine