-
E-mail
1554177591@qq.com
-
Phone
18001498990 13616133077
-
Address
Jiangsu Jintan Jindong Industrial Park
Jintan Shuibei Kanghui Experimental Instrument Factory
1554177591@qq.com
18001498990 13616133077
Jiangsu Jintan Jindong Industrial Park
SC-050Detailed information on the sand and dust test chamber:
SC-050The sand and dust test chamber is suitable for conducting dust prevention and resistance tests on all mechanical, electronic, electrochemical, and electromechanical equipment under the action of sand and dust. It is also suitable for testing product sealing performance. It is also suitable for conducting dust and dust resistance tests on various automotive components, including car lights, instruments, electrical dust covers, steering systems, door locks, etc.
SC-050The sand and dust test chamber meets the requirementsGB/T 2423.371989Basic Environmental Testing Regulations for Electrical and Electronic Products experimentL:Methods of Sand and Dust TestingGB4208-84According to the classification of shell protection levels.GB10485Dust prevention test method
SC-050Structural characteristics of sand and dust test chamber:
Stainless steel inner liner, outer shell made of high-quality steel plate spray painted, tempered glass door
Programmable controller (Germany) by Golden Bell The Moller programmable controller is used to complete the time and sequence control of the entire system
The control function is:ASand blowing time (blowing, stopping)Bvibration timeCPre set test timeDPower on (off)
Schneider AC contactors, switches, buttons (France)
Fuji time relay, Panasonic dustproof socket
SC-050Main technical parameters of sand and dust test chamber equipment:
| Technical Specifications | type number | ||||
| SC~050 | SC~080 | SC~100 | SC~150 | SC~200 | |
| Internal and external materials | stainless steel inner pot,The shell is made of high-quality steel plate sprayed with plastic,Tempered glass door | ||||
| chamber temperature | 15~35℃ | ||||
| Relative humidity | 45~75% | ||||
| Dust level inside the box | 2~4kg/m³ | ||||
| Nominal wire diameter of metal screen mesh | 50Mm | ||||
| Nominal spacing between lines | 75Mm | ||||
| Experimental dust | Dry *, Portland cement, smoke ash, etc | ||||
| control manufacture device | Golden Bell Moller Programmable Controller | ||||
| Time for blowing dust | Continuous and periodic | ||||