Welcome Customer !

Membership

Help

Hunan Kangning Electronic Technology Co., Ltd
Custom manufacturer

Main Products:

mechb2b>Products

Hunan Kangning Electronic Technology Co., Ltd

  • E-mail

    706879766@qq.com

  • Phone

    18975113086,18008494936

  • Address

    No. 358, Section 1, Wanjiali Middle Road, Yuhua District, Changsha

Contact Now

Pharmaceutical crushing unit 20A

NegotiableUpdate on 02/08
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

The medicinal crushing unit 20A consists of a crusher host, material collection bags, and a dust removal unit. The advantage is that it avoids dust flying during the crushing process of the material. The working principle of the $r $n machine is that the material enters the crushing chamber and is crushed by the impact, shear, friction of the teeth between the high-speed rotating movable gear and the fixed gear, as well as the mutual impact between the materials. After being screened by a sieve, it becomes the required powder.

Product Details

Pharmaceutical crushing unit 20AComposed of a crusher host, material collection bag, and dust removal unit. The advantage is that it avoids dust flying during the crushing process of the material.
Pharmaceutical crushing unit 20AThe working principle of the material is that it enters the crushing chamber and is crushed by the impact, shear, friction, and mutual impact of the teeth between the high-speed rotating movable toothed disc and the fixed toothed disc. After being screened by a sieve, it becomes the required powder.
The group is made of stainless steel material. Meets the requirements of GMP for drug production.

model: 20B 30B 40B

Production capacity: (kg/h) 60-150 100-300 160-280

Spindle speed: (rpm) 4500 3800 3400

Feed particle size: (mm) 6 10 12

Grinding fineness: (mesh) 60-120 60-120 60-120

Grinding motor: (KW) 5.5 7.5 11

Vacuum motor: (KW) 1.5 1.5 1.5

Dimensions: (mm) 1100 × 600 × 1650 1200 × 650 × 1650 1400 × 700 × 2310

Lubrication of the machine
The spindle needs to be lubricated regularly, ZG-2, Just open the front and rear bearing covers (change the oil every 3 months).

Installation and debugging of the machine
1. After the machine is in place, it must be placed steadily and fixed with foot screws.
2. Before testing, the interior of the machine should be cleaned and the front cover should be locked with a star shaped handle.
3. After connecting the power supply, pay attention to the sequence and rotate the spindle in the direction shown.
4. During the test drive, attention should be paid to whether there is any abnormal noise from the machine, in order to stop and check in a timely manner.
5. Install storage bags in the discharge hopper.

Operating procedures for the machine
1. The lubricating grease inside the bearing seat should be replaced regularly.
2. The temperature rise of the bearing seat shall not exceed 35 ℃
3. Do not dismantle electrical appliances and belt protective covers at will.