-
E-mail
353742707@qq.com
-
Phone
15532167582
-
Address
Hecheng Street Industrial Park, Xian County, Cangzhou City, Hebei Province
Hebei Ruida Construction Instrument Equipment Co., Ltd
353742707@qq.com
15532167582
Hecheng Street Industrial Park, Xian County, Cangzhou City, Hebei Province
ZHQG-II Autoclaved Aerated Concrete Block Cutting Machine
(1.) HainanManufacturer of autoclaved aerated concrete block cutting machinesummary:
The autoclaved aerated concrete block cutting machine is a sawing machine produced according to the mechanical performance test requirements of GB/T11969-2008 autoclaved aerated concrete performance test method. It adopts a frame type sawing machine structure, a variable frequency speed control system, and a linear guide rail for automatic cutting. It processes 100 × 100 × 100mm test blocks with high efficiency; Cut the test block flat; No dust lifting; The advantages of safe operation are laboratory equipment.
(2.)HainanManufacturer of autoclaved aerated concrete block cutting machineMain technical parameters:
1Large cutting specimen height 300mm
2Large cutting specimen width 600mm
3. Working voltage AV380v three-phase four wire
4. Total power 2KW
5. Saw blade height 700mm
6. Dimensions 1260 × 1050 × 1700
7. Net weight 480Kg
(3.)Installation adjustment:
After opening the packaging, first place the machine in a fixed location, place the control cabinet on the right side of the machine, connect the aviation plug, and connect the machineThe following is a large groove for connecting to the ash surface, for the convenience of cleaning up waste materials. The power supply is three-phase four wire, and the shell is properly grounded.
(4.)Usage of autoclaved aerated concrete block cutting machine:
First push the switch back to the knife position until it stops automatically, then move it to the middle position, put the steam pressurized concrete block on the workbench, close to the inner positioning plate, clamp the lead screw front edge with a 30mm hard foam plate, and then press the start button of the vertical saw operation part after the test block is fixed, and then the test block can be processed. In order to facilitate the use of the feed, adjust the speed as slowly as possible when feeding, adjust the knob to about 10Hz, move the switch to the feed position, and then press the start button of the vertical saw operation partReturn quickly. Although a limited position is set at the end of sawing the test block, the tester should also pay attention to observation. If the test block is cut off, the feed switch must be promptly turned to the middle stop position, and then the stop button of the vertical saw should be pressed. In case of emergency, the emergency stop switch can be pressed to cut off the power supply of the whole machine. After cutting the test block in one direction, the other parts of Figure 1 can be sawed out sequentially
(5.)Notes:
1. Is the power supply three-phase four wire and properly grounded.
2. Before cutting, the position where the workbench is parked must have the saw blade on the positioning plateInside.
3. Before cutting, add 20-30 drops of lubricating oil to the movable copper shaft sleeve of the vertical saw, and then add it every 30 minutes of operation thereafter.
4. The test block must be placed tightly against the positioning plate inside, and the feed should be turned off promptly after cutting is completed.
5. Clean up scattered ash and dust on the straight guide column in a timely manner after cutting to extend its service life
(6.)Instrument recommendations and precautions
When inspecting instruments, it is not only necessary to check whether all components are complete, but also to check whether the instrument manual is complete and properly store these materials. Before operating the instrument independently, it is necessary to carefully read the relevant instructions and strictly follow the procedures. This is a prerequisite for good instrument analysis, and once there is a problem with the instrument, it is also easy to negotiate with the manufacturer.
(7.)Product Quality Commitment:
1、 The manufacturing and testing of the product have quality records and testing data.
2、 For the testing of product performance, we sincerely invite users to personally inspect the entire process and performance of the product. After the product is confirmed to be qualified, it will be packed and shipped.
(8.)Product price commitment:
1In order to ensure the high reliability and performance of the product, the selection of materials for the system is based on domestic or high-quality brand products.