Welcome Customer !

Membership

Help

Guangzhou Leitai Electronic Technology Co., Ltd
Custom manufacturer

Main Products:

mechb2b>News

Guangzhou Leitai Electronic Technology Co., Ltd

  • E-mail

    leitai@tom.com

  • Phone

    13902217373

  • Address

    Guangzhou Liwan Huanhua Road 27 Huannan East Street

Contact Now
Lightning protection construction of Pingsheng Bridge Station on Foshan First Ring Road (2)
Date: 2022-02-23Read: 58

The renovation of Pingsheng Bridge in Foshan First Ring Road is a key project in the high-speed transformation of Foshan First Ring Road. The Pingsheng Bridge once won the title of "the world's longest span single span single tower double amplitude four cable surface self anchored suspension bridge" and was hailed as the Foshan Bridge. The bridge is a self anchored suspension bridge, with a total length of 3.2 kilometers for the main bridge and approach bridge, and the main beam is made of steel box girder.

Lightning protection construction of Pingsheng Bridge Station on Foshan First Ring Road (2)