Welcome Customer !

Membership

Help

Zibo Wanfang Electronic Technology Co., Ltd
Custom manufacturer

Main Products:

mechb2b>Products

Zibo Wanfang Electronic Technology Co., Ltd

  • E-mail

  • Phone

    13290113207/13290112885/13287089151

  • Address

    Room 409, Building A, High tech Entrepreneurship Park, Zibo High tech Zone, Shandong Province

Contact Now

What do users think about the inaccurate installation of billing energy meters by power supply companies

NegotiableUpdate on 06/15
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin

Overview

Users have the right to submit a verification application to the power supply enterprise if they believe that the billing energy meter installed by the power supply enterprise is not timely. If the error of the metering energy meter is within the allowable range, the verification fee shall be borne by the user; If the error of the billing energy meter exceeds

Product Details

Users have the right to submit a verification application to the power supply enterprise if they believe that the billing energy meter installed by the power supply enterprise is not timely. If the error of the metering energy meter is within the allowable range, the verification fee shall be borne by the user; If the error of the billing energy meter exceedsWhen leaving the allowed range, the meter inspection fee shall be borne by the power supply enterprise, and the electricity fee shall be refunded according to regulations. When users have objections to the inspection results, they can apply for verification to the higher-level metrological verification institution of the power supply enterprise within 15 days. During the period of applying for verification, users should still pay their electricity bills on time. After the verification results are confirmed, they will be processed according to regulations.http://www.zbwf.net