Welcome Customer !

Membership

Help

Hebei Huaying Water Conservancy Machinery Factory
Custom manufacturer

Main Products:

mechb2b>Products

Hebei Huaying Water Conservancy Machinery Factory

  • E-mail

    570755923@qq.com

  • Phone

    15931964999,13931902077

  • Address

    Donghuan Road Industrial Development Zone, Xinhe County, Hebei Province

Contact Now

Huaying Water Resources Supply QL-0.5-ton Hand cranked (Hand cranked) Opening and Closing Machine

NegotiableUpdate on 03/19
Model
Nature of the Manufacturer
Producers
Product Category
Place of Origin
Overview
The LQ type hand plate screw type hoist is suitable for manual operation of small flat gates with self-locking function, and the gate can stay in any position.
Product Details

LQ type prototype screw type opening and closing machine

Suitable for starting flat gates with small manual operation
With self-locking function, the gate can stay in any position.
Equipped with a protective cover and wrench, it has the function of preventing theft of water.
Configurable anti-theft buckle bucket with anti-theft function.

Installation method of hand cranked opening and closing machine
1. The installation of the foundation building for the hoist must be stable and safe. The concrete for the machine base and foundation components shall be poured according to the drawings. When the concrete strength does not reach the design strength, it is not allowed to remove or change the temporary support of the hoist, let alone carry out debugging and trial operation.
2. Install the hoist according to the lifting centerline, align the center so that the deviation of the longitudinal and transverse centerlines does not exceed ± 3mm, and the elevation deviation does not exceed ± 5mm.
3. The installation of the electrical equipment for the hoist shall comply with the provisions of the drawings and instructions, and all electrical equipment shall be reliably grounded.
4. After the installation of each hoist is completed, clean the hoist, repair damaged protective paint, and apply lubricating grease.
Hand cranked opening and closing machine debugging

1. When the hoist is unloaded, ensure that the three-phase current imbalance does not exceed ± 10%, and measure the current value.
2. The adjustment of the main controller of the hoist must ensure that the error of the gate lifting to the upper and lower limit positions does not exceed 1cm.