How to install fiberglass bridge frame properly?
Date: 2022-03-08Read: 1

  Fiberglass bridge frameIt has the characteristics of wide application, high strength, light weight, reasonable structure, low cost, long service life, strong corrosion resistance, simple construction, flexible wiring, standard installation, and beautiful appearance, which brings convenience to your technical transformation, cable expansion, maintenance and repair.
It is a type of cable tray produced using extrusion technology, which uses alkali free and twist free extrusion yarn, combined with extrusion resin, cured at high temperature, and continuously extruded into shape.
The advantages of fiberglass bridge frame are:
1. Convenient and efficient production.
2. Using molds, with high precision and good consistency in external dimensions.
3. Compared with other materials of cable trays, the price is lower.
4. The bridge frame is assembled in a split type, with flexible configuration and easy organization of production.
How to installFiberglass bridge frame
1. Mechanical equipment should be used to remove graded crushed stones from the surface layer of the foundation bed under anhydrous conditions, with a cutting scale of 5cm beyond the inner wall of the cable trench. Manually follow the agile sorting of scattered graded crushed stones and other residues. When cutting, first cut straight and then manually trim it into a 2% slope.
2. After cutting, evenly lay a layer of permeable gravel or crushed stone cushion layer at the bottom of the groove, and the thickness of the cushion layer is determined by the technician based on the measured elevation on site. A 2cm thick M7.5 cement mortar leveling layer is set at the top of the cushion layer. After the initial setting of the leveling layer mortar, the cable tray can be installed.
3. Special attention should be paid to the installation mileage corresponding to each type of cable tray during installation, and the overall linearity and drainage longitudinal slope at the bottom of the cable tray should be strictly controlled to meet the planning requirements.
4. Expansion joints should be installed during installation, with a width of 2cm and filled with asphalt and hemp reinforcement every 20m along the direction of the line. The gaps between every other two cable trays shall be filled and pointed with M7.5 cement mortar.
The above is all about how to install fiberglass bridge frames appropriately today. We hope it will be helpful for everyone to use this equipment in the future.