1) Selection of installation environment for electromagnetic sewage flowmeter:

It is advisable to stay away from equipment with strong electromagnetic fields, such as large motors, transformers, and frequency converters.

The installation site should not have strong vibrations, the pipeline should be securely fixed, and the ambient temperature should not change significantly (to prevent solid-liquid two-phase changes). The installation environment should be easy to install and maintain.

2) Selection of installation location for electromagnetic sewage flowmeter:

The installation position must ensure that the pipeline is always filled with the measured liquid.

Choose a location with low liquid flow pulses, which should be away from local resistance components such as pumps, valves, and elbows.

When measuring biphasic (solid, liquid, gas, liquid) liquids, a location that is not prone to phase separation should be selected.

The inner diameter or circumference of the tested pipeline should be easy to measure, and the ellipticity should be small.

3) Length of straight pipe section of electromagnetic sewage flowmeter:

The length of the straight pipe section on the upstream side of the sensor installation pipeline should be greater than or equal to 10D, and the downstream side should not be less than 5D (D is the diameter of the measured pipeline).

4) Flow control valves and regulating valves:

The flow control valve should be installed in the measured pipeline upstream of the sensor, and the flow control valve should be installed downstream of the sensor.