Welcome Customer !

Membership

Help

Beijing Pusanda Instrument Technology Co., Ltd
Custom manufacturer

Main Products:

mechb2b>Article

Beijing Pusanda Instrument Technology Co., Ltd

  • E-mail

    13810083196@163.com

  • Phone

    13911237038

  • Address

    Building 2, Chaomingyuan, Boxing 10th Road, Yizhuang Economic and Technological Development Zone, Beijing

Contact Now
Installation matters for precision salt spray test chamber
Date: 2022-02-25Read: 19
Precision salt spray test chamberIt is a commonly used test chamber product with advantages such as aging resistance, corrosion resistance, easy cleaning, and no leakage. It is widely used in fields such as power, machinery, building materials, and industrial and mining.
Precision salt spray test chamberIt tests the corrosion resistance of products after surface treatment of various materials, including coatings, electroplating, inorganic and organic films, anodizing, rust proof oil, and other anti-corrosion treatments.
Precision salt spray test chamberInstallation matters:
The precision salt spray test chamber should be placed about 50cm away from the wall at the back. Adequate maintenance space should be reserved on both sides.
Before the main power line of the machine, please install an additional non fuse switch or knife switch.
The smoke exhaust pipe can be extended to the outside with a diameter of 50 PVC hard pipe. Pay attention to the installation of the smoke exhaust pipe, which should be inclined downwards in a straight line from the height of the pipe mouth.
The installation position of the precision salt spray test chamber should avoid direct sunlight to avoid affecting the testing conditions.
The box is made of PVC plastic to prevent collision, and the use temperature should not exceed the test standard range to avoid deformation due to overheating.
Overtemperature indicator light: When the overtemperature light is on, the laboratory is protected from overheating. Please check if the temperature instrument temperature setting is too high or if the temperature control temperature setting is too low. If the overtemperature light continues to light up after resetting, please notify Wuhan Shangce Testing Equipment Co., Ltd. for handling.
Low water level indicator light: When the low water level light is on, the laboratory or saturator is protected from water shortage and the operating power will be cut off. At this time, the laboratory or saturator should be checked for water leakage.
End indicator light: When this light is on, it indicates the end of the experiment.